1.干燥的天气,强夯机附近的防尘洒水。驾驶室前设有防护罩,强夯机销售,不影响视线。驾驶人员应戴防护眼镜,防止坠落反弹碎石,碎玻璃的出租车司机的眼睛损伤。
1. In dry weather, dust and water should be sprayed near the dynamic rammer. There is a protective cover in front of the cab. The dynamic compaction machine is sold without affecting the sight. Drivers should wear protective glasses to prevent the eyes of taxi drivers from falling, rebounding, broken glass.
2.本机的作业场地应平整,门框基地和打夯机地面部分应在同一水平,当下沉超过100mm,应重新垫。
2. The working site of the machine should be flat, the door frame base and the ground part of the rammer should be at the same level. When the subsidence exceeds 100 mm, it should be re padded.
3.捣固机材料和门框,梁,其主要结构和部件如质量,强夯机用途,必须经过严格的检查,不符合设计要求,不得使用。
3. The material of tamping machine, door frame and beam, and its main structure and components such as quality and purpose of dynamic compaction machine must be strictly inspected, and shall not be used if they do not meet the design requirements.
4.捣固机在工作状态下,吊杆角度应是70度。梯门腿无错位,门架支腿不支持垫,更不用提锤。
4. When the tamping machine is working, the boom angle should be 70 degrees. There is no dislocation of the legs of the ladder door, and the legs of the gantry do not support the pad, let alone lift the hammer.

5.变换的内存位置,应重新检查门架支腿,证明是稳定可靠的,然后提锤100 ~ 300mm,稳定性检验机,确认的可靠性,可以工作。
5. For the changed memory location, the gantry legs should be rechecked to prove that they are stable and reliable. Then lift the hammer 100 ~ 300 mm, and the stability testing machine is used to confirm the reliability and work.
6.磅下降,钩尚未锤前部近环,经营者不得在下钩。从坑锤,强夯机厂家,严禁人员站立钩锤锤提升。
6. The operator is not allowed to lower the hook when the weight is lowered and the hook is not yet hammered near the front ring. From the pit hammer and dynamic rammer manufacturer, it is strictly forbidden for personnel to stand up and lift the hook hammer.
7.当夯具有对应于挡在运营通风孔,应经常清洁。但是,禁止清理下锤。当夯坑水击或由粘土上的吸附容量增加,应采取措施排除,不能强行提锤。
7. When the rammer has corresponding stop in the operation ventilation hole, it should be cleaned frequently. However, do not clean the hammer. When the water hammer in the ramming pit or the adsorption capacity on the clay increases, measures should be taken to eliminate it, and the hammer cannot be lifted by force.
8.转移夯点,通过辅助转移锤,门框与夯机运动之前,脚离地面高度不得超过500mm。
8. Transfer the tamping point. Before the door frame and rammer move, the height of the foot from the ground shall not exceed 500mm.
9.手术后,应锤下来,放在地上。在非操作时严禁将锤悬在空中。
9. After the operation, hammer it down and put it on the ground. Do not hang the hammer in the air when not in operation.