强夯机出租厂家有哪些_大黄蜂机械值得一选

网址:http://www.sddhfjx.cn/   发布日期:2020-09-03 关注次数:
     针对强夯处理工程,监理工程师为便于在施工过程中有效开展质量控制,首先应熟悉施工图纸,强夯机了解设计意图和经强夯处理后设计所要达到的目标,弄懂强夯施工的有关技术参数。
For the dynamic compaction treatment project, in order to effectively carry out the quality control in the construction process, the supervision engineer should first be familiar with the construction drawings, understand the design intent of the dynamic compaction machine and the design objectives after the dynamic compaction treatment, and understand the relevant technical parameters of the dynamic compaction construction.
1、单位夯击能强夯锤重M (t)与落距h (m)是影响夯击能和加固深度的重要因素,它直接决定每一击的夯击  能量,锤重一般不宜小于8t,落距一般不小于6m。强夯锤重M与落距h的乘积称为夯击能E=(M ×h)。强夯的单位夯击能(指单位面积上所施加的总夯击能),应根据地基类别、结构类别、荷载大小和要求处理的深度等综合考虑,并通过现场试夯确定,强夯这就要求监理工程师在试夯施工过程中组织有关单位不断加以总结,并及时反馈给设计部门。
1. The hammer weight m (T) and drop distance h (m) of unit tamping energy dynamic compaction are important factors affecting the tamping energy and reinforcement depth. They directly determine the tamping energy of each blow. The hammer weight should not be less than 8t and the drop distance should not be less than 6m. The product of hammer weight m and drop distance h is called tamping energy E = (m × h). The unit ramming energy of dynamic compaction (refers to the total tamping energy applied per unit area) should be comprehensively considered according to the foundation type, structure type, load size and required treatment depth, and determined by field test compaction. Therefore, supervision engineer is required to organize relevant units to summarize and timely feed back to the design department in the process of trial compaction construction.


夯击能过小,加固效果差;分击能过大,不仅浪费能源增加费用,而且对饱和粘性土会破坏土体,形成橡皮土,降低强度。从我国强分施工现状来看,在一般情况下,对于粗颗粒土可取1000-3000KN·m/m2;细颗粒土可取1500-4000KNm/m2,而且选用单击夯击能以不超过3000KNm较为经济。在同一单击能量(机械提升能量)情况下,采用重锤低落距处理地基工程优于轻锤高落距强夯方案。
If the tamping energy is too small, the reinforcement effect is poor; if the differential energy is too large, it will not only waste energy and increase the cost, but also damage the saturated cohesive soil, forming rubber soil and reducing the strength. According to the current situation of dynamic construction in China, in general, 1000-3000kn · M / m2 is recommended for coarse-grained soil, 1500-4000knm / m2 for fine-grained soil, and it is more economical to select single-click compaction energy of no more than 3000knm. Under the same single click energy (mechanical lifting energy), heavy hammer with low drop distance is better than light hammer high drop distance dynamic compaction scheme.
2、夯击点布置及间距      一般情况下,夯击点间距取决于基础布置、加固土层厚度和土质等条件。加固土层厚、土质差、透水性弱、含水率高的粘性土,夯点间距宜大,如果夯击点太密,相邻夯击点的加固效应将在浅处叠加而形成硬壳层,影响夯击能向深部传递;加固土层薄、透水性强、含水量低的砂质土间距宜小些,通常夯击点间距取夯锤直径的3倍,一般一遍夯击点间距为5~9m,以后各遍夯击点可与一遍相同,也可适当减小。对处理深度较深或单击夯击能较大的工程,一遍夯击点间距宜适当增大。
2. Generally, the spacing of tamping points depends on the layout of foundation, the thickness of reinforced soil layer and soil quality. For the cohesive soil with thick soil layer, poor soil quality, weak water permeability and high water content, the spacing between tamping points should be large. If the tamping points are too dense, the reinforcement effect of adjacent compaction points will be superimposed at the shallow place to form a hard shell layer, which will affect the transmission of tamping energy to the deep part. The spacing of sand soil with thin soil layer, strong water permeability and low water content should be smaller. Generally, the spacing of tamping points should be 3 times of the diameter of the rammer, generally 1 The spacing of each tamping point is 5-9m, and it can be the same as that of the first time, or it can be reduced appropriately. For projects with deep treatment depth or large single click tamping energy, the spacing of one-time tamping points should be appropriately increased.
对于中小规模的工程,强夯施工队会对工程进行质量检查,尤其是检查施工质量,此表要由单位现场负责人填写,质量管理主要是图纸会审,技术交底,施工组织设计,工序交接等质量评定制度。
For small and medium-sized projects, the dynamic compaction construction team will carry out quality inspection of the project, especially the construction quality. This form should be filled in by the on-site person in charge of the unit. The quality management mainly includes the quality evaluation system such as joint review of drawings, technical disclosure, construction organization design, process handover, etc.