强夯施工减少工期的重要事项

网址:http://www.sddhfjx.cn/   发布日期:2021-01-08 关注次数:0
1、多台设备同时操作
1. Simultaneous operation of multiple devices
这是直接的一个缩短工期的方法,假如是现场容许,并且自己的设备齐全的话可能多台设备同时操作,可能有用的缩短时光。
This is a direct way to shorten the construction period. If it is allowed on site and the equipment is complete, multiple equipment may be operated at the same time, which may be useful to shorten the time.
2、做好预期
2. Make expectations
每天做一个预期,每周做一个预期。例当初天可能做多少工作,来日可能做多少工作,而后每天每周都把这些工作做完,这样可能增加缓跟感。不要小看这一项工作,有的时候做好预期会比不做预期节俭多少天的时光。预期切实就是给员工一个目标,有缓跟感。
Make an expectation every day and an expectation every week. For example, how much work you may do in the first day and how much work you may do in the future, and then finish these work every day and every week, which may increase the sense of slowness. Don't underestimate this work. Sometimes it will save more days to do well than not to do well. Practical expectation is to give employees a goal and a sense of ease.
3、做好前期交换:这个十分的重要,有的时候交换不到位就会造成后期的停工,或者是返工景象,这样只会增加时光不会缩短时光。交换包含很多的方面,例如资料的收拾,现场的定位,施工技巧员的现场测试等等,把所有的细节交换到位,并且是记录在案,这样对后期的施工有很大的便利。
3. Do a good job in the early exchange: This is very important. Sometimes, if the exchange is not in place, it will cause the later shutdown or rework, which will only increase the time, not shorten the time. Exchange includes many aspects, such as data collection, site positioning, on-site testing of construction technicians, etc. all details are exchanged in place and recorded, which is very convenient for later construction.
4、做好问题的评估
4. Do a good job in problem assessment
对现场考试之后,评估一下后期的时候会碰到哪些问题,会须要哪些设备进行帮助。这个时候就须要提前准备,基本的就是不能延误设备的运行,不能延误强夯施工,不能呈现强夯机械停机等待其余工作。
After the on-site examination, evaluate what problems will be encountered in the later stage and what equipment will be needed for help. At this time, we need to prepare in advance, the basic thing is not to delay the operation of the equipment, not to delay the dynamic compaction construction, not to present the dynamic compaction machinery shutdown waiting for the rest of the work.