强夯机的操作流程是怎么样的?

网址:http://www.sddhfjx.cn/   发布日期:2020-08-31 关注次数:0
强夯机的操作流程是怎样的呢,对此你有什么了解和看法吗,我们这篇文章就为你解惑一下它到底是怎样工作的呢?下面跟随小编一起来为大家看看: 强夯机租赁
What is the operation process of dynamic compaction machine? Do you have any understanding and views on this? This article will help you to understand how it works? Let's take a look at it
1)作为强夯作业的主要单位,应根据压实度等级进行计算和选择。以履带式起重机为主机,实施履带起重机的有关规定。
1) As the main unit of dynamic compaction, it should be calculated and selected according to the degree of compaction. With crawler crane as main engine, relevant regulations of crawler crane shall be implemented.
(2)捣固机工作区域应平稳,龙门架底座和捣固机地面应保持水平。当沉降超过100mm,框架的高度应再次提高。
(2) The working area of tamping machine shall be stable, and the base of gantry frame and the ground of tamping machine shall be kept horizontal. When the settlement exceeds 100 mm, the height of the frame should be raised again.
(3)对龙门框架、横梁、脱钩装置的主要结构和构件的材料和制造质量进行严格检查,不得按设计要求使用。
 
(3) The materials and manufacturing quality of the main structures and components of the gantry frame, crossbeam and unhooking device shall be strictly inspected and shall not be used according to the design requirements.
(4)在捣固机工作状态下,吊杆应置于海平面70度以上。
(4) When the tamping machine is working, the boom should be placed above 70 degrees of sea level.
(5)的梯形门架腿不能错位前、后支腿,并不能解除对垫锤。
(5) The front and rear legs of the trapezoidal portal frame can not be dislocated, and the cushion hammer cannot be removed.
(6)改变位置后,门腿应再次检查确认的稳定性和可靠性,然后锤应解除100 ~ 300mm,整机的稳定性应进行检查,下班后可以证实它是可靠的。
(6) After changing the position, the door leg should be checked again to confirm the stability and reliability, and then the hammer should be removed by 100 ~ 300 mm. The stability of the whole machine should be checked, and it can be confirmed that it is reliable after work.
(7)锤是向后的,在钩头降低到锤环之前,操作者不能钩坑。当把锤子从坑里抬出来时,禁止把人钩在锤子上,用锤子把它抬起来。
(7) The hammer is backward and the operator cannot hook the pit before the hook head is lowered to the hammer ring. When the hammer is lifted out of the pit, it is forbidden to hook people on the hammer and lift it with a hammer.
(8)当锤具有相应的排气孔时,应随时清洗。但严禁在锤下清洗。
(8) When the hammer has corresponding vent hole, it should be cleaned at any time. However, cleaning under the hammer is strictly prohibited.
(9)夯坑内有水或粘土时,应锤底力,不得吊锤。
(9) When there is water or clay in the tamping pit, the bottom force of the hammer shall be removed and the hammer shall not be lifted.
(10)通过辅助机械传递转移捣固点的捣固点。从地面到腿的高度不得超过500mm的距离龙门和夯锤的作用。
(10) The tamping point of tamping point is transferred by auxiliary mechanical transmission. The height from the ground to the leg shall not exceed 500mm from the gantry and rammer.
(11)锤击后,应放下并放在地上。严禁在非操作期内将锤子吊在空中。
(11) After hammering, it should be put down and put on the ground. It is strictly forbidden to hang the hammer in the air during the non operation period.
在使用强夯机前,你要对其进行检测,要把放在首位,不能让设备带病工作,这是对生命的不负责任,对事情的不认真,所以,再做任何事情前要先摆好自己的态度!
Before using the dynamic compaction machine, you should first carry out safety inspection on it. First of all, safety should be put in the first place, and the equipment should not work with diseases. This is irresponsible for life and not serious about things. Therefore, before doing anything again, you should put your attitude in place first!