Construction monitoring is very important for the construction of dynamic compaction method and dynamic compaction replacement method. It is difficult to check whether the parameters and construction steps adopted in the construction meet the design requirements, so it is difficult to inspect after the construction lodging. Therefore, special personnel are generally responsible for the monitoring during the construction process
1、开始施工前应检查夯锤质量及落距,以确保单机夯击能量符合设计要求。
1. Before the construction, the quality and falling distance of rammer should be checked to ensure that the single ramming energy meets the design requirements.

强夯机租赁

强夯机租赁
2、在每一遍夯击前,应对夯点放线进行复核,夯完后检查夯坑位置,发现偏差或漏夯应及时纠正。
2. Before each tamping, the setting out of tamping point shall be rechecked. After tamping, the position of tamping pit shall be checked. Any deviation or missing tamping shall be corrected in time.
3、施工过程中应按设计要求检查每个夯点的夯击数和每击的夯沉量。对强夯置换应检查置换深度。
3. During the construction process, the number of tamping at each tamping point and the tamping settlement of each tamping point shall be checked according to the design requirements. For dynamic compaction replacement, the replacement depth should be checked.
4、施工过程中应对各项参数和施工情况进行详细记录。
4. During the construction process, detailed records shall be made of various parameters and construction conditions.