大型强夯施工时对捣固点的严格要求

网址:http://www.sddhfjx.cn/   发布日期:2022-08-10 关注次数:0
无论前期准备工作做得多好,也不能完全避免强夯地基处理不会出现问题。特别是大型强夯施工和大型强夯施工都是体积庞大的复杂结构。如果前期检查没有问题,施工过程中可能会出现意想不到的问题。下面强夯机租赁厂家为您讲解处理方法。
No matter how well the preparatory work is done in the early stage, it can not completely avoid the problems of dynamic compaction foundation treatment. Especially, large-scale dynamic compaction construction and large-scale dynamic compaction construction are complex structures with huge volume. If there are no problems in the early inspection, unexpected problems may occur during the construction process. The following dynamic compaction machine rental manufacturer will explain the treatment method for you.
有时候,大型强夯施工会发现轨道掉了,这是相当常见的。这种问题在大型强夯施工长期使用或者大型强夯施工老化的情况下会短暂出现。这时就要检查大型强夯施工的导向轮,看是否磨损严重,如果磨损严重,就要更换导向轮。
Sometimes, it is quite common for large-scale dynamic compaction construction to find that the track has fallen off. This kind of problem will appear briefly in the case of long-term use of large-scale dynamic compaction construction or aging of large-scale dynamic compaction construction. At this time, it is necessary to check the guide wheel of large-scale dynamic compaction construction to see if it is seriously worn. If it is seriously worn, it is necessary to replace the guide wheel.
如果轨道变松怎么办。新履带刚装的时候很紧,用久了会变松。在大型强夯施工的日常检查中,需要时刻注意履带的松紧,因为履带一松就干脆掉下来了。履带使用时间长了会更换,时间长了只需要更换销套。
What if the track becomes loose. The new crawler is very tight when it is installed, and it will become loose after a long time. In the daily inspection of large-scale dynamic compaction construction, it is necessary to pay attention to the tightness of the track at all times, because the track will simply fall down once it is loose. The crawler will be replaced when it is used for a long time, and only the pin sleeve needs to be replaced when it is used for a long time.
联锁板联锁板是维护轨道的一层。如果磨损激烈,就会失去保养功能,需要直接更换。大型强夯施工处理地基,更换轨道,安装,非常简单。即使出现此类问题,现场工作人员也能自行解决。
Interlocking board interlocking board is a layer of maintenance track. If the wear is severe, the maintenance function will be lost and it needs to be replaced directly. The construction of large-scale dynamic compaction is very simple, such as foundation treatment, track replacement and installation. Even if such problems occur, the on-site staff can solve them by themselves.
强夯机租赁
随着雨季的到来,很多土地变成了湿陷性黄土甚淤泥。地基中湿陷性黄土大型强夯施工处理的测量方法有哪些?大型强夯施工在很多工程中可以用来处理湿陷性黄土,因为其意在提高地基承载力,降低土层压缩性。而且这种方法操作非常方便快捷,节省资金和投资资金,在施工中加固方面具有明显的优势。
With the arrival of the rainy season, many lands have become collapsible loess or even silt. What are the measurement methods for large-scale dynamic compaction of collapsible loess in the foundation? Large-scale dynamic compaction can be used to treat collapsible loess in many projects, because it is intended to improve the bearing capacity of the foundation and reduce the compressibility of the soil layer. Moreover, this method is very convenient and quick to operate, saves money and investment, and has obvious advantages in reinforcement during construction.
湿陷性黄土的处理方法:
Treatment method of Collapsible Loess:
1.处理湿陷性黄土常用的方法有很多种,如垫层法、素土垫层法、灰土垫层法等。这些不同的方法有不同的过程。比如垫层法,就是对湿陷性黄土地基进行局部或单侧处理,可以处理的黄土层厚度大概在一到三厘米左右。这种垫层法可以根据不同的施工方法要求承载力和增强水稳性。选择整体灰土垫层进行处理。
1. There are many methods commonly used to treat collapsible loess, such as cushion method, plain soil cushion method, lime soil cushion method, etc. These different methods have different processes. For example, the cushion method is to treat the collapsible loess foundation locally or unilaterally. The thickness of the loess layer that can be treated is about one to three centimeters. This cushion method can meet the requirements of bearing capacity and water stability according to different construction methods. Select the whole lime soil cushion for treatment.
2.另一种方法是素土垫层法。素土垫层法是基坑开挖后的原始图纸。先用水洒水湿润,然后选择一种机械回填,分层回填的方法。它可以设计高度。与机械的做工、土壤的含水量、铺土的厚度等等都有很大的关系。
2. The other method is plain soil cushion method. Plain soil cushion method is the original drawing after foundation pit excavation. Water shall be sprayed for wetting first, and then a method of mechanical backfilling and layered backfilling shall be selected. It can be designed in height. It has a great relationship with the work of machinery, the moisture content of soil, the thickness of paving soil and so on.
大型强夯施工时对捣固点的严格要求的相关内容就是这样了,如果您对此有什么问题就来我们网站http://www.sddhfjx.cn咨询了解吧。
This is the relevant content of the strict requirements for tamping points during large-scale dynamic compaction construction. If you have any questions about this, please come to our website http://www.sddhfjx.cn Consult and understand.