工程的建设逐渐的把人工时代转变为工业的机器代替人工劳作的时代,以前那个纯人工搬运和出力的年代已经久远。如今在建厂房时地基的施工已经很少的使用人力来完成,强夯工程带着自身的只用重工业的设备就可以完成的优势在很大的程度上降低了成本。在现在人工难找也很贵的情况下,强夯工程就成了好的选择。不过厂房施工如下的问题要注意。
The construction of the project has gradually transformed the artificial era into an era in which industrial machines replace manual work. The previous era of pure manual handling and output has been long gone. Nowadays, when the plant is under construction, the foundation construction has been completed with little manpower. The dynamic compaction project has the advantage that it can be completed only with heavy industrial equipment, which has reduced the cost to a great extent. In the current situation that labor is difficult to find and expensive, dynamic compaction engineering has become a good choice. However, the following problems should be paid attention to in plant construction.
一、勘测地质需认真详细
1、 Careful and detailed geological survey is required
强夯工程公司对地质的勘测要做的仔细到位。地基是厂房的基础,在好的厂房若是地基不扎牢固都是很不可取的。在做地基强夯时前要把地质的数据测量清楚分析到位,综合的做好勘测这样的建造出来的厂房才能有不错的质量经久耐用。
The Dynamic Compaction Engineering Company shall carefully carry out geological survey in place. The foundation is the foundation of the plant. If the foundation is not firm in a good plant, it is very undesirable. Before the foundation dynamic compaction, the geological data shall be measured and analyzed clearly, and the comprehensive survey shall be done well. Only in this way can the built plant have good quality and durability.
二、强夯强度的仔细测量
2、 Careful measurement of dynamic compaction strength
强夯工程施工公司在施工时对土地进行了压缩,在工程施工一段时间时要对土地的强度进行测量以保证将来工程的顺利进行。因为土地的土质有所不同要是不检测就会给后期的施工带来不必要的麻烦,所以要在工程进行一两周后进行检测。
The Dynamic Compaction Engineering Construction Company compresses the land during construction, and measures the strength of the land during construction for a period of time to ensure the smooth progress of the project in the future. Because the soil quality of the land is different, if it is not tested, it will bring unnecessary trouble to the later construction, so it should be tested after a week or two of the project.
三、后期的沉降度的数据分析
3、 Data analysis of later settlement
地基强夯工程在做好地基后要仔细的观察沉降度以确保后期工程开展的顺利完整。沉降的度数是厂房后期的质量的确保,一个好的质量牢靠的地基对于建设好厂房很重要在沉降上要做好工作。
In the foundation dynamic compaction project, carefully observe the settlement after completing the foundation, so as to ensure the smooth and complete development of the later project. The degree of settlement is the guarantee of the later quality of the plant. A good and reliable foundation is very important for the construction of the plant. We should do a good job in settlement.
强夯工程公司在做厂房强夯工程时把上述的勘测、强度、还有沉降度的问题做的详细扎实,就可以把厂房的地基做的质量做的牢靠和坚固,为将来的厂房的顺利的施工奠定了良好的基础,强夯工程是顺应时代发展的工程,随着生产力的快速的发展,会很好的发展和顺利的前行。
When the Dynamic Compaction Engineering Company does the Dynamic Compaction Engineering of the plant, it can make the quality of the foundation of the plant firm and firm, and lay a good foundation for the smooth construction of the plant in the future. The Dynamic Compaction Engineering is a project that conforms to the development of the times. With the rapid development of productivity, It will develop well and move forward smoothly.
在点夯时,有时夯击能达不到设计要求。为大家介绍一下形成这种结果的原因和措施
During point ramming, sometimes the ramming can not meet the design requirements. Let's introduce the reasons and measures for this result
形成这种情况大概有下面五种原因:
There are five reasons for this:
1、夯锤质量过小,远远达不到设计要求;2、夯锤底面积过大,还达不到设计要求;3、夯锤提升的高度达不到设计要求;4、夯坑底倾斜过大;5、夯坑积水较为严重。
1. The quality of rammer is too small to meet the design requirements; 2. The bottom area of the rammer is too large to meet the design requirements; 3. The lifting height of the rammer cannot meet the design requirements; 4. The inclination of tamping pit bottom is too large; 5. Ponding in tamping pit is serious.
如何做才能防止这种情况的发生呢?给大家介绍以下四种的防护措施
What can be done to prevent this from happening? Let's introduce the following four protective measures
(1)施工前,应认真检查夯锤质量和夯锤底面积是否达到要求,夯锤宜选用16~20t、底面积4~5m2的平底锤
(1) Before construction, carefully check whether the quality and bottom area of the rammer meet the requirements. The rammer should be a flat bottom hammer with a bottom area of 4 ~ 5m2 and a capacity of 16 ~ 20t
(2)选择起重能力大于锤重2~2.5倍的履带式起重机。强夯地面要平,否则引起起重机吊臂倾斜而使提升高度达不到要求
(2) The crawler crane with lifting capacity 2 ~ 2.5 times greater than the hammer weight shall be selected. The dynamic compaction ground shall be flat, otherwise the crane boom will tilt and the lifting height will not meet the requirements
(3)每次点夯时,夯坑位置应经过整平,倾斜面不应大于30°
(3) During each point tamping, the tamping pit position shall be leveled, and the inclined plane shall not be greater than 30 °
(4)夯坑位置有积水时,应及时采取措施进行排水,保证夯击位置无积水。
(4) In case of ponding at the tamping pit, timely measures shall be taken to drain water to ensure that there is no ponding at the tamping position.