强夯地基施工会受到很多因素的影响,这些因素都会影响地基强夯施工的后果,施工的进度等等。强夯地基在施工中怕的就是受到地下水的影响,一些处所的水位比较低,在地基处理施工的进程中就会呈现出水的景象。还有一种就是施工对点自身就有水,须要短时光之内排水等等。这对强夯地基都是有一定的影响的,下面强夯为你具体讲解一下两种方法的处理方法。地下水对强夯地基有哪些影响
Dynamic compaction foundation construction will be affected by many factors, which will affect the consequences of dynamic compaction foundation construction, construction progress and so on. The fear of dynamic compaction foundation in construction is that it is affected by groundwater. The water level in some places is relatively low, and water will appear in the process of foundation treatment construction. Another is that the construction point itself has water, which needs to be drained in a short time, etc. This has a certain impact on the dynamic compaction foundation. The following dynamic compaction will explain the treatment methods of the two methods for you. What are the effects of groundwater on dynamic compaction foundation
1.施工场地内有积水
1. There is ponding in the construction site
假如是短时光之内的积水还利益理,只有是抽干积水而后略微晾干就可能操作了。例如一些雨季在一些低洼的地带会呈现类似的问题;假如是积水时光比较长,就须要提前进行排水,尽量减低积水对强夯地基的影响。给水处理之后假如是由淤泥的情况下须要进行淤泥的,这个须要提前处理好,为强夯地基供给一个好的施工环境。
If the accumulated water in a short time is not reasonable, it is possible to operate only by pumping out the accumulated water and then drying it slightly. For example, some rainy seasons will present similar problems in some low-lying areas; If the ponding time is relatively long, it is necessary to drain in advance to minimize the impact of ponding on dynamic compaction foundation. After water supply treatment, if it is necessary to eliminate the sludge under the condition of sludge, it needs to be treated in advance to provide a good construction environment for dynamic compaction foundation.
2.强夯之后出水:这是因为地下水位比较低造成的,个别在秋季跟冬季轻易呈现。解决的办法就是可能在周边挖多少个排水井,这样积水可能顺着水渠排入排水井,而后再排出场地之外。
2. Water after dynamic compaction: This is caused by the relatively low groundwater level, which is easy to appear in autumn and winter. The solution is how many drainage wells may be dug around, so that the accumulated water may be discharged into the drainage wells along the canal, and then discharged out of the site.