强夯施工遇强夯工程机械故障应该如何做?

网址:http://www.sddhfjx.cn/   发布日期:2021-06-02 关注次数:0
前期的准备工作做得再好也不能完全避免在强夯地基处理中不会出现问题,尤其是强夯设备,强夯机比较笨重结构复杂,前期巡查没有问题在施工过程当中也有可能会出现意想不到的问题。强夯检查强夯施工过程中的各项测试数据和施工记录,不符合设计要求时应补夯和采取其它有用措施。
No matter how well the preparatory work is done in the early stage, it can not be completely avoided that there will be no problems in the dynamic compaction foundation treatment, especially the dynamic compaction equipment, the dynamic compaction machine is bulky and the structure is complex, there is no problem in the early stage inspection, and there may be unexpected problems in the construction process. Dynamic compaction shall check the test data and construction records in the process of dynamic compaction. If they do not meet the design requirements, supplementary compaction and other useful measures shall be taken. Dynamic compaction construction for you to explain the treatment method.
强夯机有时候会发现履带掉落的情况,这种情况比较常见,强夯机长期使用或者强夯机老化的时候容易出现这类问题,这个时候就需要检查一下强夯机的引导轮看磨损是否严重,如磨损严重的话就需要更换引导轮。强夯检查强夯施工过程中的各项测试数据和施工记录,不符合设计要求时应补夯和采取其它有用措施。
强夯机租赁
Dynamic compaction machine sometimes finds track falling, which is more common. When dynamic compaction machine is used for a long time or the dynamic compaction machine is aging, it is easy to have such problems. At this time, it is necessary to check the guide wheel of dynamic compaction machine to see if the wear is serious. If the wear is serious, it is necessary to replace the guide wheel. Dynamic compaction shall check the test data and construction records in the process of dynamic compaction. If they do not meet the design requirements, supplementary compaction and other useful measures shall be taken.
履带变松了怎么办。强夯置换其特点是:可使用工地常备简单设备;施工工艺、操作简单;适用土质范围广,加固效果显著,可取得较高的承载力,一般地基强度可提高2~5倍;压缩性可降低2~10倍,加固影响深 度可达6~10m;工效高,施工速度快(一般设备每月可加固5000~10000m地基),较换上回填和桩基可缩短工期一半;节省加固原材料;施工费用低,节省投资,比换土回填节省50%费用,与预制桩加固地基相比,可节省投资50%~70%等。
What if the track gets loose. The features of dynamic compaction replacement are: it can use simple equipment on site; The construction technology and operation are simple; It can be applied to a wide range of soil, and the reinforcement effect is remarkable. It can obtain higher bearing capacity, and the general foundation strength can be increased by 2-5 times; The compressibility can be reduced by 2-10 times, and the reinforcement depth can reach 6-10m; High efficiency and fast construction speed (common equipment can reinforce 5000-10000m foundation per month), which can shorten the construction period by half compared with the replacement of backfill and pile foundation; Save raw materials for reinforcement; The construction cost is low, the investment is saved, the cost is 50% less than that of soil replacement and backfilling, and the investment is 50% ~ 70% less than that of precast pile foundation reinforcement.
新履带刚刚安装的时候是十分的紧的,使用时间长了之后就会变松,日常对强夯机检查时就需要时刻注意履带的松紧程度,因为履带松了就容易掉落。履带使用时间长了就更换,不长只需要更换销套就可以了。
When the new track is just installed, it is very tight, and it will become loose after a long time of use. In daily inspection of dynamic compaction machine, it is necessary to pay attention to the tightness of the track, because it is easy to fall when the track is loose. If the track is used for a long time, it will be replaced. If not, it only needs to replace the pin sleeve.
互链板。互链板就是保护履带的那层,磨损(零部件失效的一种基本类型)厉害的话就是去了保护作用,需要直接更换。强夯地基处理好在履带更换个安装都很简单,即使出现这类问题现场的工作人员就可以自行进行更新。
Chain board. The chain link plate is the layer that protects the track. If the wear (a basic type of component failure) is severe, it is to remove the protective effect and need to be replaced directly. Dynamic compaction foundation treatment is very simple in the track replacement and installation, even if there are such problems, the on-site staff can update by themselves.