欢迎来到山东途畅路桥工程有限公司官网!

logo

  1. 专注强夯机租赁,液压冲击夯租赁、强夯工程施工碎石桩等
  2. 地基软基处理于一体的高质量基础工程施工公司

全国施工租赁热线

18264104888

强夯机标准而严格的操作规程总结

网址:http://www.sddhfjx.cn/   发布日期:2021-04-07 关注次数:0
1、强夯机检查施工过程中的试验数据和施工记录,不符合设计要求,应夯实或采取其他有效措施。在强夯置换施工中,可采用超重型或重锥体动力触探试验检测位移墩底条件。
1. Dynamic rammer shall check the test data and construction records during construction, which is not in conformity with the design requirements, and other effective measures shall be tamped or taken. In the dynamic compaction replacement construction, the dynamic penetration test of super heavy or heavy cone can be used to detect the condition of displacement pier bottom.
强夯机竣工检验验收地基承载力2,处理后的强夯,应在一定的时间间隔施工结束即可,对于碎石土和砂土,时间间隔可以是7 ~ 14d;粉土和粘土可以14 ~ 28d。强夯置换间隔时间是可取的28d。
The foundation bearing capacity 2 shall be inspected and accepted after completion inspection of dynamic rammer. The dynamic compaction after treatment shall be completed at a certain time interval. For gravel soil and sand, the time interval can be 7 ~ 14d; silt and clay can be 14 ~ 28d. The interval between dynamic compaction replacement is 28 days.
3、强夯机竣工验收后的动态替换的基础,承载力检验应采用单墩载荷试验、动力触探应确定和置换墩底承载力和密度随深度的变化情况的一种有效手段,对饱和粉土地基允许单墩复合地基载荷试验代替单码头的使用负载测试。
3. For the foundation of dynamic replacement after the completion of dynamic compaction machine, the bearing capacity test shall be an effective method of single pier load test, dynamic penetration determination and replacement of the bearing capacity and density of pier bottom with depth. The single pier composite foundation load test is allowed to replace the single wharf load test for saturated silt foundation.
4、强夯机承载力竣工验收检验的数量,应根据场地和建筑物的重要性确定的复杂性,对于网站上的一般建筑,不到3点,每个测试点荷载试验的建筑基础不应是复杂的或重要的基础;施工现场应增加检查点。强夯置换地基的荷载试验及位移墩底数的检测不应少于墩数的l %,不得少于3点。
4. The quantity of acceptance inspection for the bearing capacity of dynamic rammer shall be determined according to the complexity of the site and the importance of the building. For the general buildings on the website, less than 3 points, the building foundation of load test at each test point shall not be complex or important foundation; additional inspection points shall be added at the construction site. The load test of dynamic compaction replacement foundation and the detection of displacement pier bottom number shall not be less than 1% of the number of piers, and shall not be less than 3 points.
5。强夯机试验桥墩的直径和深度应符合设计要求。
5。 The diameter and depth of the test pier of dynamic rammer shall meet the design requirements.
强夯机操作规则
Operation rules of dynamic rammer
(1)强夯机作为强夯作业的主机,应按强夯等级要求进行计算和选择。以履带起重机为主机的,应当执行履带起重机的有关规定。
(1) As the main machine of dynamic compaction operation, the dynamic rammer shall be calculated and selected according to the requirements of dynamic compaction grade. If the crawler crane is the main engine, the relevant provisions of the crawler crane shall be implemented.
(2)夯管锤的工作场地应平整,与框架的基础和夯锤场地应保持水平,要复活时,沉降超越100mm。
(2) The working site of the rammer shall be flat, and the foundation and ramming site of the frame shall be kept horizontal. When the pipe hammer is to be resurrected, the settlement shall exceed 100mm.
(3)龙门架、横梁和脱钩装置的主要结构和部件的材料和制造质量必须严格检查,在不符合设计要求的情况下不得使用。
(3) The material and manufacturing quality of main structures and components of gantry, cross beam and decoupling device must be strictly checked and shall not be used in case of non-compliance with design requirements.
(4)强夯机在工作状态下,吊杆应放置在海拔70度处。
(4) The boom shall be placed at 70 degrees above sea level when the dynamic rammer is in operation.
(5)梯形门架前后腿不得错位,龙门支架的腿在铺设前不得抬起。
(5) The front and rear legs of trapezoidal gantry shall not be dislocated, and the legs of gantry support shall not be lifted before laying.
(6)改变位置后,应再次检查龙门架的腿,以确定其稳定性和可靠性。然后,落锤应升级100300mm,整机的稳定性应进行检查,并可进行操作确认后的可靠性。
(6) After changing the position, the legs of the gantry should be checked again to determine their stability and reliability. Then, the drop hammer shall be upgraded to 100 to 300mm, the stability of the whole machine shall be checked and the reliability after operation confirmation can be carried out.
(7)当锤落时,操作者不得在吊钩坠落到锤环附近之前将其推进。当把锤子从坑里吊起来时,严禁将工作人员粘在锤子上,用锤子把锤子举起来。
(7) When the hammer falls, the operator shall not push the hook before it falls near the hammer ring. When lifting the hammer from the pit, it is strictly forbidden to stick the staff on the hammer and lift it with a hammer.
(8)强夯机当锤上有相应的通气孔时,在操作中发生堵塞时,应随时进行清洗。但严禁在锤下清洗。
(8) When there is corresponding vent hole on the hammer, the dynamic rammer shall be cleaned at any time when the plug occurs during operation. But it is strictly forbidden to clean under the hammer.
(9)夯坑积水或锤底增加时,应采取措施,不得强行提锤。
(9) When the water in the pit is accumulated or the hammer bottom increases, measures shall be taken to eliminate it and the hammer shall not be lifted forcibly.
(10)当转移夯点的夯锤,由辅助机转移。支腿的高度应不超过500mm在龙门随夯。
(10) When the rammer at the transfer point is transferred, it is transferred by the auxiliary machine. The height of the legs shall not exceed 500mm and be rammed at the gantry.
(11)强夯机操作后,应将锤子放下并放在地上。非操作时,不得将锤子悬挂在空气中。
(11) After the dynamic rammer is operated, the hammer shall be lowered and placed on the ground. Do not hang the hammer in the air when not in operation.
  • 标签: