影响强夯施工的三种因素吧

网址:http://www.sddhfjx.cn/   发布日期:2020-09-10 关注次数:0
强夯施工的快慢是受到一定的因素影响的,这个些因素每一个都能够影响着强夯施工的效率,下面就和强夯机施工小编一起来看下影响强夯施工的三种因素吧。
The speed of dynamic compaction construction is affected by certain factors. Each of these factors can affect the efficiency of dynamic compaction construction. Let's take a look at the three factors that affect the dynamic compaction construction together with the construction of dynamic compaction machine.
1、强夯击能
1. Dynamic compaction energy
夯击的强度不够会导致土地基地无法夯实,地基空隙没有彻底消失,夯击的强度一般取决于夯锤的夯击高度于夯锤本身的体重有关。
If the tamping strength is not enough, the foundation foundation can not be compacted and the foundation gap is not completely disappeared. The tamping strength generally depends on the ramming height of the rammer and the weight of the rammer itself.
 
2、夯锤的接触面
2. Contact surface of rammer
这儿的夯锤接触面不一定是越大越好,是越符合地基实际情况越好,主要取决于夯锤的静压力,静压力是指当这个静压力小于标准范围时夯击地面会导致外表坚固、低沉松软,那静压力是越大越好吗,不尽然,当静压力大约某个点也可导致夯锤夯力过大堕入地基无法拔出形成施工困难。
The larger the contact surface of the rammer is, the better it is in line with the actual situation of the foundation. It mainly depends on the static pressure of the rammer. Static pressure refers to that when the static pressure is less than the standard range, ramming the ground will lead to the appearance of firm, low and soft. Is the greater the static pressure, the better it is. However, when the static pressure is about a certain point, it can also lead to the excessive tamping force of the rammer falling into the foundation It is difficult to pull out.
3、地基的属性
3. Properties of foundation
强夯公司应做到量体裁衣的作战政策,用科学的仪器和谨慎的思维情绪去看待问题,尽力剖析地基的结构、成分、环境,来判别使用的方法。
The dynamic compaction company should adopt the combat policy according to the circumstances, treat the problems with scientific instruments and cautious thinking mood, and try to analyze the structure, composition and environment of the foundation, so as to judge the method used.