影响强夯施工进展的要素都有哪些呢?

网址:http://www.sddhfjx.cn/   发布日期:2022-05-28 关注次数:0
强夯施工的时分施工的进展有时分会受到影响,那么影响施工进展的要素都有哪些呢?
The progress of dynamic compaction construction is sometimes affected. What are the factors that affect the progress of construction?
1、强夯击能
1. Dynamic compaction energy
夯击的强度不行会导致土地基地无法夯实,地基空地没有完全消失,夯击的强度一般取决于夯锤的夯击高度于夯锤自身的体重有关。
If the tamping strength is not good, the land base cannot be tamped, and the foundation space does not disappear completely. The tamping strength generally depends on the tamping height of the tamping hammer and its own weight.
2、夯锤的接触面
2. Contact surface of RAM
这儿的夯锤接触面纷歧定是越大越好,是越契合地基实际情况越好,首要取决于夯锤的静压力,静压力是指当这个静压力小于规范规模时夯击地面会导致表面巩固、消沉松软,那静压力是越大越好吗,不尽然,当静压力大约某个点也可导致夯锤夯力过大堕入地基无法拔出构成施工困难。
The larger the contact surface of the rammer here is, the better it fits the actual situation of the foundation. It mainly depends on the static pressure of the rammer. The static pressure refers to that when the static pressure is less than the standard scale, ramming the ground will lead to surface consolidation, depression and softness. Is the greater the static pressure, the better? Not necessarily. When the static pressure is about a certain point, it can also lead to too much rammer force falling into the foundation and unable to pull out, which constitutes construction difficulties.
3、地基的特点
3. Characteristics of foundation
强夯公司应做到因地制宜的作战方针,用科学的仪器和慎重的思想心情去看待问题,极力分析地基的结构、成分、环境,来判别运用的办法。
The dynamic compaction company shall adopt the operational policy of adjusting measures to local conditions, treat problems with scientific instruments and prudent thoughts, and try to analyze the structure, composition and environment of the foundation to identify the methods used.
强夯施工过程中为了保证质量合格,除了要求各技术参数到达规范,还要严厉依照强夯施工的过程来进行施工。接下来咱们就来说说强化施工的过程。
In order to ensure the qualified quality during the dynamic compaction construction, in addition to requiring all technical parameters to meet the specifications, the construction shall be carried out strictly according to the dynamic compaction construction process. Next, let's talk about the process of strengthening construction.
1.土质
1. soil quality
有些地基并不合适立刻就进行强夯处理,需求行换土填土,这些都是需求紧密的核算,到达满足的密实度再进行强夯处理就会得到的作用。
Some foundations are not suitable for dynamic compaction immediately. It is necessary to replace the soil and fill the soil first. These are the needs of close accounting. It will be effective to carry out dynamic compaction after reaching the required compactness.
2.强夯和夯锤的参数
2. parameters of dynamic compaction and rammer
夯锤需求核算的数据一般是分量,直径等,其他数据则是怎么安置夯点、夯击次数、夯击遍数、以及夯击深度等,假如地基承载力不强夯从未达不到质量上的要求,那么就要添加夯击次数,可是要距离一段时刻,给土层一个自己沉降和调整的时刻后,再从头金行强夯,一般是缓冲一个月再次进行。
The data of tamping hammer demand accounting are generally component, diameter, etc. other data are how to place the tamping point, tamping times, tamping times, and tamping depth, etc. if the foundation bearing capacity is not strong and the quality requirements are never met, then the tamping times should be added, but it should be a period of time away. After giving the soil layer a time for its own settlement and adjustment, the dynamic tamping should be carried out again from the beginning of the project, which is generally buffered for a month.
3.节奏
3. rhythm
一般在强夯施工开工之前就现已订好了施工时长和日完结工程量,假如每天达不到定好的工程量,到约好的工期结尾时分就会十分的赶,匆匆忙忙完结的作业必定是会有瑕疵的,遵守规则和过程适当的重要。
Generally, the construction duration and daily completion quantities have been set before the commencement of dynamic compaction construction. If the set quantities are not reached every day, it will be in a hurry at the end of the agreed construction period. The operation completed in a hurry must be defective. It is important to observe the rules and process properly.