浅析关于厂房强夯应该注意的三大事项!

网址:http://www.sddhfjx.cn/   发布日期:2021-08-26 关注次数:0
工程的建设逐渐的把人工时代转变为工业的机器代替人工劳作的时代,以前那个纯人工搬运和出力的年代已经久远。如今在建厂房时地基的施工已经很少的使用人力来完成,强夯工程带着自身的只用重工业的设备就可以完成的优势在很大的程度上降低了成本。在现在人工难找也很贵的情况下,强夯工程就成了好的选择。不过厂房施工如下的问题要注意。
The construction of the project has gradually transformed the artificial era into an era in which industrial machines replace manual work. The previous era of pure manual handling and output has been long gone. Nowadays, when the plant is under construction, the foundation construction has been completed with little manpower. The dynamic compaction project has the advantage that it can be completed only with heavy industrial equipment, which has reduced the cost to a great extent. In the current situation that labor is difficult to find and expensive, dynamic compaction engineering has become a good choice. However, the following problems should be paid attention to in plant construction.
一、勘测地质需认真详细
1、 Careful and detailed geological survey is required
强夯工程公司对地质的勘测要做的仔细到位。地基是厂房的基础,在好的厂房若是地基不扎牢固都是很不可取的。在做地基强夯时前要把地质的数据测量清楚分析到位,综合的做好勘测这样的建造出来的厂房才能有不错的质量经久耐用。
The Dynamic Compaction Engineering Company shall carefully carry out geological survey in place. The foundation is the foundation of the plant. If the foundation is not firm in a good plant, it is very undesirable. Before foundation dynamic compaction, the geological data shall be measured and analyzed clearly and comprehensively, so that the built plant can have good quality and durability.
二、强夯强度的仔细测量
2、 Careful measurement of dynamic compaction strength
强夯工程施工公司在施工时对土地进行了压缩,在工程施工一段时间时要对土地的强度进行测量以保证将来工程的顺利进行。因为土地的土质有所不同要是不检测就会给后期的施工带来不必要的麻烦,所以要在工程进行一两周后进行检测。
The Dynamic Compaction Engineering Construction Company compresses the land during construction, and measures the strength of the land during construction for a period of time to ensure the smooth progress of the project in the future. Because the soil quality of the land is different, if it is not tested, it will bring unnecessary trouble to the later construction, so it should be tested after a week or two of the project.
三、后期的沉降度的数据分析
3、 Data analysis of later settlement
地基强夯工程在做好地基后要仔细的观察沉降度以确保后期工程开展的顺利完整。沉降的度数是厂房后期的质量的确保,一个好的质量牢靠的地基对于建设好厂房很重要在沉降上要做好工作。
In the foundation dynamic compaction project, carefully observe the settlement after completing the foundation, so as to ensure the smooth and complete development of the later project. The degree of settlement is the guarantee of the later quality of the plant. A good and reliable foundation is very important for the construction of the plant. We should do a good job in settlement.