强夯施工过程质量掌权方法有什么在强夯施工过程中,要留心做好查验工作中,比方丈量施工放线、夯锤落距、夯点间隔、夯击进行等,要遵循三检制,并做好检查记录,进而确保强夯施工质量,确保所有工程项目质量。
What are the quality control methods in the process of dynamic compaction? In the process of dynamic compaction, we should pay attention to the inspection work, such as measuring construction setting out, dropping distance of rammer, interval of ramming points, ramming progress, etc. we should follow the three inspection system, and make inspection records, so as to ensure the quality of dynamic compaction construction and the quality of all engineering projects.
1.强夯工程项目开工前,查验丈量施工放线、夯锤份量、夯锤落距是不是恰当,做好工程验收工作中,保证夯击过程中落距一直坚持不会改变,并选择设计方案恳求的工业设备机构施工,保证每击都能做到设计方案点击夯击能。
1. Before the start of dynamic compaction project, check whether the construction setting out, weight of rammer and falling distance of rammer are appropriate. During the project acceptance, ensure that the falling distance will not change during the process of ramming, and select the industrial equipment organization requested by the design scheme for construction, so as to ensure that the design scheme can click the ramming energy.
2.要核查丈量基准点、基准点跟定位桩,将施工丈量掌权点拉到不会受到施工危害的坚固地址。
2. Check the measurement datum point, datum point and positioning pile, and pull the power point of construction measurement to a firm address that will not be harmed by construction.
3.每一锤在宣布升职前,夯锤要恰当对好锤位,确保每一锤必须升职到令人满意设计方案夯能恳求的高宽比。
3. Before announcing the promotion of each hammer, the hammer should be properly aligned to ensure that each hammer must be promoted to the height width ratio required by the satisfactory design.
4.夯锤落下来后,夯坑底端有歪斜超出20度的,用土将坑底抹平,再开展下一次的夯击工作。
4. After the rammer falls down, if the bottom of the ramming pit deviates more than 20 degrees, the bottom of the pit shall be smoothed with soil, and then the next ramming work shall be carried out.
5.每一个夯坑的每一击,必须纪录了夯坑的下移量,并确保施工纪录的准确性。
5. For each blow of each tamping pit, the downward movement of the tamping pit must be recorded, and the accuracy of the construction record must be ensured.
6.施工当场及夯坑由于降水或土壤温度回暖等诱因存水时,要立即采用排水管道方法,等谁排干后,再将夯坑开展回填土。
6. When water is stored on the construction site or in the tamping pit due to precipitation or soil temperature warming, the drainage pipe method shall be adopted immediately, and the tamping pit shall be backfilled after it is drained.
在强夯施工过程中,有很多查验工作中需要严苛恳求,并在一些关键点层面要多留心,为强夯工程项目质量提供确保。