关于强夯法施工的准备工作怎么履行

网址:http://www.sddhfjx.cn/   发布日期:2022-04-01 关注次数:0
关于强夯法施工的准备工作怎么履行,强夯机施工,在进行强化施工的时分,场所需求保证必定的平坦性,关于机械设备进出,到排出地表水,安徽强夯机,到施工的形式和用具的运用,也要进行活跃的去处理,这样可以避免在进行强夯法运用的进程中呈现积水或许地下水的问题,一起要查明在进行强夯法运用的进程中邻近的水源或许是一些地下管线的方位,在有这样的状况的时分要进行及时的标志,采纳必要的办法,避免由于强夯法的施工形成必定的损坏。一起要去丈量放线定出操控轴线,强夯场所边线标出焊点的方位,在不受强夯影响地址设置水准基点。
As for how to perform the preparation work of dynamic compaction method construction, during the construction of dynamic compaction machine, first of all, when strengthening the construction, the site needs to ensure certain flatness. As for the access of mechanical equipment, the discharge of surface water, Anhui dynamic compaction machine, the application of construction forms and tools, it should also be actively treated, so as to avoid the problem of ponding or groundwater in the process of dynamic compaction method application, Together, it is necessary to find out the location of the adjacent water source or some underground pipelines in the process of using the dynamic compaction method. When there is such a situation, it is necessary to timely mark and adopt necessary methods to avoid certain damage caused by the construction of the dynamic compaction method. We should measure and set out together, determine the control axis, mark the orientation of the welding point on the sideline of the dynamic compaction site, and set the benchmark at the address not affected by the dynamic compaction.
在施工前,应该按照设定的强夯法的参数进行条件的试验,强夯机施工队,如果在进行强夯的进程中,地下水管现已搬迁,或许是现已进行了处理,那么就可以进行强夯的施行了。在全体的强夯的进程中所运用的机械设备是要保证其稳定性,这样才可以在进行强夯的进程中有更好的实际作用,也不会遭到外界的影响。
Before construction, the condition test should be carried out according to the parameters of the set dynamic compaction method. If the underground water pipe has been relocated or treated in the process of dynamic compaction, the dynamic compaction can be carried out. The mechanical equipment used in the whole process of dynamic compaction is to ensure its stability, so that it can have a better practical role in the process of dynamic compaction and will not be affected by the outside world.
强夯施工的运用是可以改进修建地基,所以在进行强夯的时分是要有丰厚的计划来进行强夯的施工,这样才可以在强夯法的施工前,施工后以及施工中有很好的施工方法和保证,关于强夯法的施行来说,也可以由于有计划性的强夯而到达必定的强夯的作用,关于强夯法的施行是有清晰的含义的,所以计划的施行是要保证清晰性。
The application of dynamic compaction construction can improve the construction of foundation, so it is necessary to have rich plans for dynamic compaction construction during dynamic compaction, so that there can be good construction methods and guarantees before, after and during the construction of dynamic compaction method. As for the implementation of dynamic compaction method, it can also achieve a certain role of dynamic compaction due to planned dynamic compaction. The implementation of dynamic compaction method has a clear meaning, Therefore, the implementation of the plan is to ensure clarity.
此时,强夯置换地基承担的 荷载假如是通过一定厚度跟刚度的 地坪板传下来的 , 如产业地坪面荷载,那么要考虑恰当加厚地坪钢筋混凝土板。确保冲切验算等满意请求,此时单墩承担荷较为其承担面积上的 地坪板自重跟板上荷教,单墩承载力特点值满意即可。假如是往基成其余独*荷教等直接作用在微体上,单墩承载力特点值要满意往基等荷教直楼作用的 请求,假如是较大的 面积设备等局部肯教,单墩承教力特点值要情足按基本面积摊派到每个墩上的 作用
At this time, if the load borne by the dynamic compaction replacement foundation is transmitted through the floor slab with certain thickness and stiffness, such as the surface load of the industrial floor, it is necessary to consider appropriately thickening the floor reinforced concrete slab. Ensure that the punching checking calculation and other requirements are satisfied. At this time, the load borne by the single pier is relatively large, and the self weight of the floor slab on its bearing area is consistent with the load on the slab. The characteristic value of the bearing capacity of the single pier can be satisfied. If it is to base into the rest of the independent * Dutch teaching and other direct effects on the micro body, the characteristic value of the bearing capacity of the single pier shall meet the requirements of the direct building function of the Dutch teaching and other similar to base. If it is a large area of equipment and other parts willing to teach, the characteristic value of the bearing capacity of the single pier shall be fully apportioned to each pier according to the basic area
强夯施工结束后应间隔一定时间方能对地基质量进行检验。对于碎石土和砂土地基,其间隔可取1~2周;低饱和度的粉土和黏性土地基可取2~4周。共同打造强夯市场,作强夯市场企业; 公司凭借多年强夯施工的实力,拥有承接高难度、大面积的强夯和强夯置换工程的力量
After the completion of dynamic compaction, the foundation quality can be inspected at a certain interval. For gravel soil and sandy soil foundation, the interval can be 1 ~ 2 weeks; Silt and cohesive soil foundation with low saturation can be taken for 2 ~ 4 weeks. Jointly build the dynamic compaction market and become an enterprise in the dynamic compaction market; With the strength of strong tamping company for many years, the construction area and replacement of strong tamping are very difficult
对于强夯的过程中,材料是能够得到一定的节省的,在进行填充的时候,或者是强夯置换的时候都是能够达到减低建材的消耗功能的,功能也是非常明显。
In the process of dynamic compaction, materials can be saved to some extent. When filling or dynamic compaction replacement, it can reduce the consumption of building materials, and the function is also very obvious.
以上就是为大家介绍的有关强夯机租赁的详细介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务http://www.sddhfjx.cn
The above is a detailed introduction to the lease of dynamic compaction machine. I hope it will be helpful to you If you have any questions, please contact us We will provide you with professional service http://www.sddhfjx.cn