欢迎来到山东途畅路桥工程有限公司官网!

logo

  1. 专注强夯机租赁,液压冲击夯租赁、强夯工程施工碎石桩等
  2. 地基软基处理于一体的高质量基础工程施工公司

全国施工租赁热线

18264104888

强夯机出租的是由什么决定的?

网址:http://www.sddhfjx.cn/   发布日期:2021-04-06 关注次数:0
随着强夯施工技术的发展,强夯机的租赁需求也随之增加,这也促进了强夯机租赁公司的发展,不同强夯机租赁公司的也是各不相同。这种情况下可能就会有人问这样的问题:强夯机出租的是由什么决定的?下面就来为大家详细介绍一下:
With the development of dynamic compaction construction technology, the leasing demand of dynamic compaction machine also increases, which also promotes the development of dynamic compaction machine leasing companies. The prices of different dynamic compaction machine leasing companies are also different. In this case, someone may ask such a question: what determines the rental price of dynamic compaction machine? Here is a detailed introduction:
强夯夯击能分为低能级,中能级,高能级,施工工程的大小决定了夯击能的大小,锤重与落距的乘积称为夯击能,强夯怎么算?强夯施工队可以通过现场试夯确定夯击能,夯击能过小,加固效果差;夯击能过大,对于饱和粘土,会破坏土体形成橡皮土,降低强度。
Dynamic compaction energy can be divided into low energy level, medium energy level and high energy level. The size of construction project determines the size of compaction energy. The product of hammer weight and falling distance is called compaction energy. How to calculate the price of dynamic compaction? The dynamic compaction construction team can determine the compaction energy through on-site trial compaction. If the compaction energy is too small, the reinforcement effect is poor; if the compaction energy is too large, the saturated clay will be damaged to form rubber soil and reduce the strength.
强夯机单价与许多因素有关,一般按计价。单价的多少主要关系与强夯施工的工程量,强夯的夯击能,工期,地质条件等等,不可同类而语,一般单价由10元/㎡-30元/㎡不等。
The unit price of dynamic compaction machine is related to many factors, which is generally priced by square meter. The unit price is mainly related to the construction quantity, tamping energy, construction period, geological conditions, etc. it is not the same. The general unit price is from 10 yuan / m2 to 30 yuan / m2.
强夯单价一般包括强夯机施工的人工费,柴油费,机械费,材料费,设备的转移费,管理费及税金。一般不包含夯坑推平的费用及夯后检测的费用。
The unit price of dynamic compaction generally includes labor cost, diesel cost, machinery cost, material cost, equipment transfer cost, management cost and tax. Generally, it does not include the cost of tamping pit leveling and testing after tamping.
  • 标签: