强夯施工时为什么要设计间歇时间

网址:http://www.sddhfjx.cn/   发布日期:2020-12-04 关注次数:0
1、强夯施工应属于动态信息化的施工方法,强夯残奥仪表的筛选从工程实践地质情况和标准的经验值开始确认强夯残奥仪表,经过试打时的归纳检验方法验证数值。
1. Dynamic compaction construction should be a dynamic information construction method. The selection of dynamic compaction instrument for Paralympic Games should start from the geological conditions of engineering practice and the standard empirical value, and verify the value through the inductive test method during the trial driving.
2、一点打桩数除现场打桩获得的打桩量外,中化确认岩土工程强夯设备,云同步必须满足施工现场不应该在以下几个条件:打桩孔周围的地面上产生过大的拱形,打桩孔太深,难以锤起

2. In addition to the amount of pile driving obtained on site, Sinochem confirms that the geotechnical dynamic compaction equipment must meet the following conditions at the construction site: the ground around the pile driving hole is too large, and the pile driving hole is too deep to hammer
3、地基土中的孔隙水压力丧失,渗透性差的土地基础必须有一定的间隔时间。 渗透性好的地基可以连续打击,但详细的施工有72小时以上的间隙。
3. Because of the loss of pore water pressure in the foundation soil, the soil foundation with poor permeability must have a certain interval time. The foundation with good permeability can be hit continuously, but there is a gap of more than 72 hours in the detailed construction.
4 .要“夯”深层加固的结束,必须注意锤子记号的1/3说唱乐。
4. To "tamp" the end of deep reinforcement, we must pay attention to 1 / 3 rap music marked by hammer.
5 .及时清理夯土洞和场地内积水路基夯土设备,进行测量和检验工作,仔细记录。
5. Timely clean up the rammed earth hole and the rammed earth equipment of the subgrade with accumulated water in the site, carry out measurement and inspection, and record carefully.
6 .进行管理作业,强击施工区域,禁止闲人进入
6. Carry out safety management operation, attack the construction area and forbid people to enter