强夯施工过程中有何措施能尽量保证安全

网址:http://www.sddhfjx.cn/   发布日期:2021-05-05 关注次数:
强夯机是在建筑工程中由于需要对松土压实处理的机器,往往使用强夯机处理,强夯机种类有很多,有蛙式,有震动式,有跃步式,有打夯式,还有吊重锤击式,根据工程需要,所以运用不同类型的强夯机。
Dynamic compaction machine is a kind of machine for loose soil compaction in construction engineering. It is often used for treatment. There are many types of dynamic compaction machine, including frog type, vibrating type, step type, ramming type and hanging hammer type. According to the needs of engineering, different types of dynamic compaction machine are used.
安 全操作如下:
The safe operation is as follows:
1、施工现场应全 面规划,并有施工现场平面图,其场地应平整、平整、平整、交叉,危险区域应标注。
1. The construction site shall be planned comprehensively, and the construction site plan shall be provided. The site shall be flat, level, level and cross, and the dangerous area shall be marked.
2、各类机电设备操作工,必 须经过培训、考核和认证,了解机械结构、性能、操作程序、维修和故障排除等一般故障。
2. All kinds of mechanical and electrical equipment operators must be trained, assessed and certified to understand the mechanical structure, performance, operation procedures, maintenance, troubleshooting and other general faults.
3、驾驶人和经营者必 须取得有关部门批准或者经营许可证才能驾驶车辆。其他司机不得擅自驾驶或开启汽车。
3. Drivers and business operators must obtain approval or business license from relevant departments before driving vehicles. Other drivers are not allowed to drive or start the car without permission.
4、石灰粉、石灰筛选及使用水泥作业人员必 须戴口罩、眼镜、手套等。
4. Operators of lime powder, lime screening and using cement must wear masks, glasses, gloves, etc.
5、电气设备的供电应按照有关规定架设和安装。电气设备应具有良好的接地和零接地电阻不超过4欧姆,并配备可靠的电击保护装置。
5. The power supply of electrical equipment shall be erected and installed in accordance with relevant regulations. Electrical equipment should have good grounding and zero grounding resistance, not more than 4 ohm, and be equipped with reliable electric shock protection device.
6、使用篡改操作过程时,严禁篡改电缆。
6. Tampering with cables is strictly prohibited during tampering operation.
7、为减少锤击时机械吊臂的摆动和回弹,应特别设置吊臂支撑系统。每天启动机器前,必 须检查锤的机械部分,是否正常,钢丝绳是否磨损,及时发现问题。
7. In order to reduce the swing and rebound of the mechanical boom when hammering, the boom support system should be specially set. Before starting the machine every day, it is necessary to check whether the mechanical part of the hammer is normal and whether the wire rope is worn, so as to find out the problems in time.
8、强夯将进行压实工作后,提锤的速度应均匀,锤或钩不触臂,应该用来保护汽车挂废轮胎。
8. After dynamic compaction, the speed of lifting the hammer should be uniform, and the hammer or hook should not touch the arm, which should be used to protect the car from hanging waste tires.
9、磅重、吊臂和锤子不低于1500万。非人员应远离夯点30m。强夯机施工队伍
9. Pounds, boom and Hammer no less than 15 million. Non personnel shall be 30 m away from the tamping point. Dynamic compaction machine construction team